Lamella separator - Botteling plant

U bent hier

Novotec delivered and installed a pretreatment system for the existing waste water treatment unit of a bottling plant. The plate package of the unit has a projected surface of 60 m² and treats up to 30 m³/h. The challenge in this project was the fact that the separator had to be installed at a height of 6 m and a drum screen system had to be installed on top of the separator. For access to all the parts, Novotec provided the necessary support structures, operator's platforms and stairs.